New-build handover: a developer's guide

A newly completed London residential development

A new building's reputation is made — or marred — in its first year. Getting block management set up properly at handover protects the developer's name, the first residents' experience, and the building itself. Here's how to do it well.

Why handover matters

The transition from construction site to occupied, managed building is where things most often go wrong — under-set budgets, missing documents and compliance gaps that surface only once people have moved in. A clean handover protects the developer's reputation long after the last unit is sold, and it gives the first residents confidence that the scheme they have bought into is being run properly from the very first day.

Getting the structure right

Decide and set up the management structure early, well before completion. That means resolving whether the freehold will be retained or sold, whether a Resident Management Company (RMC) is built into the leases — with leaseholders as members — and appointing a managing agent to run the building day to day. Clarity on these points at the outset avoids confusion, disputes and costly retrofitting once the building is occupied.

Setting a realistic first-year budget

This is perhaps the single most important step. An over-optimistic first-year service charge looks attractive at the point of sale, but it leads to a painful jump in year two and, with it, unhappy residents who feel they were sold a figure that was never sustainable. Budgets should reflect the true cost of running the building — staffing, maintenance, insurance, compliance and reserves — rather than the lowest number that helps shift units.

Get the first-year budget and the documentation right, and everything after is easier.

Documentation and the golden thread

Capture the building's information at handover, while it is still readily available. That includes operation and maintenance (O&M) manuals, warranties, the health-and-safety file from the CDM process and the as-built drawings. For higher-risk buildings, it also means the digital "golden thread" of safety information required under the Building Safety Act — accurate, accessible records kept for the life of the building. Information that isn't captured at handover is hard, and sometimes impossible, to recover later.

Compliance from day one

Put compliance in place before residents move in, not after. That means a fire risk assessment, electrical and lift arrangements, water hygiene measures and buildings insurance all live and in order from the first day of occupation — so the building is both safe and legal the moment the first leaseholder turns the key.

A clean handover checklist

  • Management structure agreed and set up
  • A realistic, honest first-year budget
  • O&M manuals, warranties and as-built drawings captured
  • Golden thread in place for higher-risk buildings
  • Compliance live before occupation
  • Defects and warranty process agreed
  • Residents onboarded with a named manager

Defects and warranties

Agree how snagging and defects will be handled, and make that process clear to everyone involved. Set out the defects liability period, the structural warranty in place — such as a new-homes warranty — and a clear route for residents to report issues. Knowing where to turn, and how problems will be resolved, makes the difference between a minor teething issue and a lasting grievance.

Onboarding residents

  • Welcome the first leaseholders properly — introduce the managing agent and a named manager so there is a real person behind the building.
  • Set up the resident portal and a straightforward way to report issues, so residents can get help from day one.
  • Explain the service charge — what it covers and why — so the first bill is understood rather than resented. First impressions last.

This article is general guidance on setting up management for a newly completed residential building and is not legal advice. Requirements vary by scheme — please take professional advice on your specific development and its obligations.