As more residents switch to electric vehicles, charging is becoming a live question for blocks of flats. Handled well it adds value; handled badly it creates safety, fairness and capacity headaches. Here's what directors need to consider.

Why EV charging is now a block issue

Resident demand is rising, and ad-hoc requests to install chargers are increasingly common. Getting ahead of it with a clear, coordinated approach is far better than reacting one request at a time. A single resident wiring a charger to their own bay might seem harmless, but multiplied across a block — with no plan for electrical capacity, fire safety or fairness — it quickly becomes a problem for the directors who are ultimately responsible for the building.

The key challenges

EV charging in a block touches several areas at once, and each needs careful thought:

  • Electrical capacity — the building's incoming supply may not support many chargers without an upgrade.
  • Cost — who pays for installation, and who pays for the electricity used.
  • Allocation — which parking spaces get chargers, and fairness between residents who want them and those who do not.
  • Fire safety — lithium-ion battery risks and the implications for the fire risk assessment, especially in covered or underground car parks.
  • Consent — a leaseholder usually needs the freeholder's or RMC's permission, and sometimes a lease variation.

Your options

There is no single right answer, and the best route depends on the building, the demand and the budget. Common approaches include:

  • Individual chargepoints in allocated bays, installed for residents who want them.
  • Shared communal chargers that any resident can use, often in visitor or shared bays.
  • 'Charging as a service' — a provider who funds, installs and manages the infrastructure, recovering costs through usage charges.
  • Future-proofing — installing the cabling and groundwork now and adding charge points over time as demand grows.
Plan EV charging for the whole building — before residents start installing their own.

Funding and grants

Government grant schemes have existed to help flat owners, landlords and residential car parks with the cost of chargepoints and supporting infrastructure. Schemes and eligibility change over time, so check what is currently available before budgeting — what applied last year may have closed, changed or been replaced. Treat any grant as a potential reduction to the bill rather than something to rely on until it is confirmed.

Getting it right

A sensible roll-out follows a clear sequence rather than reacting to individual requests:

  • Assess the electrical capacity, involving the network operator if an upgrade is needed.
  • Survey the site so the practical layout and routing are understood.
  • Agree a clear policy covering who can install, where, and on what terms.
  • Consult residents so the approach is understood and supported.
  • Consider whether Section 20 consultation applies if communal works exceed the thresholds.
  • Choose a reputable provider and manage all consents properly.

EV charging — what to consider

  • Electrical capacity and possible supply upgrade
  • Who pays for installation and electricity
  • Fair allocation of bays and chargers
  • Fire-safety and the fire risk assessment
  • Consents and possible lease variations
  • Section 20 if communal works exceed thresholds

The role of your agent

A managing agent can lead a coordinated, safe and fair roll-out — capacity assessment, policy, provider selection, consents and compliance — rather than leaving residents to install their own in an uncontrolled way. That coordination protects the building, keeps directors on the right side of their obligations, and ensures the result is something the whole development benefits from rather than a patchwork of one-off installations.

This article is general guidance on EV charging in residential blocks and is not legal advice. Grants and rules change over time and obligations depend on your building — please check the current position and take professional advice on your specific circumstances.

Residents asking about EV charging?

We'll lead it safely and fairly.

EKOR coordinates EV-charging roll-outs end to end — capacity, policy, consents and compliance. Request a no-obligation proposal.

Request a proposal →
Keep reading