The Building Safety Act 2022, explained
Higher-risk buildings, the Accountable Person, the safety case and golden thread.
Read article →
As more residents switch to electric vehicles, charging is becoming a live question for blocks of flats. Handled well it adds value; handled badly it creates safety, fairness and capacity headaches. Here's what directors need to consider.
Resident demand is rising, and ad-hoc requests to install chargers are increasingly common. Getting ahead of it with a clear, coordinated approach is far better than reacting one request at a time. A single resident wiring a charger to their own bay might seem harmless, but multiplied across a block — with no plan for electrical capacity, fire safety or fairness — it quickly becomes a problem for the directors who are ultimately responsible for the building.
EV charging in a block touches several areas at once, and each needs careful thought:
There is no single right answer, and the best route depends on the building, the demand and the budget. Common approaches include:
Plan EV charging for the whole building — before residents start installing their own.
Government grant schemes have existed to help flat owners, landlords and residential car parks with the cost of chargepoints and supporting infrastructure. Schemes and eligibility change over time, so check what is currently available before budgeting — what applied last year may have closed, changed or been replaced. Treat any grant as a potential reduction to the bill rather than something to rely on until it is confirmed.
A sensible roll-out follows a clear sequence rather than reacting to individual requests:
A managing agent can lead a coordinated, safe and fair roll-out — capacity assessment, policy, provider selection, consents and compliance — rather than leaving residents to install their own in an uncontrolled way. That coordination protects the building, keeps directors on the right side of their obligations, and ensures the result is something the whole development benefits from rather than a patchwork of one-off installations.
This article is general guidance on EV charging in residential blocks and is not legal advice. Grants and rules change over time and obligations depend on your building — please check the current position and take professional advice on your specific circumstances.
EKOR coordinates EV-charging roll-outs end to end — capacity, policy, consents and compliance. Request a no-obligation proposal.
Request a proposal →
Higher-risk buildings, the Accountable Person, the safety case and golden thread.
Read article →
The thresholds and stages you must follow before committing to major works.
Read article →
The questions every director should ask — on fees, transparency, compliance and service.
Read article →